Licensed Land Surveyor Reviews Utility Easements

Signing a utility easement can feel like routine paperwork. A power, water, or telecom provider needs a strip of land, an agreement shows up, and everyone wants it recorded quickly. Once that document is recorded, though, it usually stays attached to the land for good, and it can shape where you build for decades. Having a licensed land surveyor review the description and exhibit before recording catches errors while they’re still easy to fix.
Why Utility Easement Documents Need Surveyor Review
A utility easement gives a provider the right to install, maintain, and access lines on part of your property. The recorded document defines where that right applies. If the location is described wrong, the easement may cover more land than intended, miss the actual line, or conflict with plans you haven’t built yet.
Many easement documents include a legal description and a sketch, often called an exhibit. Depending on the utility, county, and project, these may be prepared by the utility’s surveyor, the owner’s surveyor, or both. Requirements for who signs and seals them vary, so check with the utility and the county recording office.
Even when the utility provides the exhibit, the owner benefits from an independent check. The utility’s goal is to protect its line. Your goal is to protect the use and value of your land, and those interests don’t always line up perfectly.
Verifying Property Boundaries and Utility Easement Locations
An easement is only as reliable as the boundary it ties to. A surveyor first confirms that the parent parcel description, the full property the easement crosses, matches the current deed and title records. If the parcel description is outdated or wrong, the easement built on it inherits the problem.
Next, the surveyor checks where the easement actually sits. That may mean comparing the description to an existing line in the field or to a proposed design. A strip described 10 feet off the wrong line can end up in the middle of your future building pad.
Some easements are described as a strip with set boundaries on both sides. Others run along a centerline with a width split on each side. Both are common, but each needs careful wording so the area is clear. A surveyor can confirm the description produces the shape everyone expects.
Reviewing Legal Descriptions and Easement Exhibit Accuracy
Legal descriptions for easements usually start at a known point, then follow bearings and distances to define the area. The surveyor checks that the math closes, the starting point is correct, and each call matches the exhibit. Small errors, like a transposed number or a wrong bearing direction, can shift an easement by many feet.
The exhibit should match the written description exactly. Reviewers often find differences between the two, such as a width labeled differently or a line drawn in a different place. When the two disagree, it can create confusion about which controls.
Common items to check include:
- Parcel identification and owner names
- The point of commencement and point of beginning
- Bearings, distances, and curve data
- Easement width and total area
- Labels on the exhibit that match the description
- Reference to the correct recorded plat or deed
Typos copied into a recorded document are harder to fix than typos caught in a draft. Corrections after recording may require a new or corrective instrument, which takes time and cooperation from the utility.
Identifying Utility Conflicts With Future Site Development
The location of a utility easement can limit what you build later. Many easements restrict permanent structures, and some limit grading, trees, fences, or paving within the easement area. The exact restrictions depend on the easement language and the utility’s policies.
Before recording, compare the proposed easement against your future plans. A surveyor can overlay it on the boundary, setbacks, existing easements, and any concept site plan. That shows whether the strip cuts through a future building area, a parking lot, or a stormwater pond.
If the easement conflicts with plans, raise it before signing. Utilities can sometimes shift the alignment, narrow the width, or place the line along a property edge. Those conversations are much easier before recording than after installation.
Watch for overlapping easements too. A new utility easement placed on top of an existing drainage or access easement can create conflicts over use and maintenance. The surveyor can show where existing recorded easements already fall.
Final Survey Checks Before Recording Utility Easements
Before the document goes to the clerk, do a last review with your surveyor, attorney, and the utility. Confirm that the description, exhibit, and agreement all match each other. Make sure the final version is the one reviewed, not an earlier draft.
Recording offices often have formatting rules for margins, page size, and legibility. Exhibits that don’t meet those rules may be rejected or come back for revision. Check the county’s recording requirements before finalizing.
Keep a copy of the recorded easement and the exhibit with your property records. Share it with your design team so future plans respect it. If the line is installed later, an as-built check can confirm it was placed inside the recorded easement area.
Frequently Asked Questions
Who prepares the legal description for a utility easement?
It depends on the utility and the project. Sometimes the utility’s surveyor prepares it, and sometimes the owner’s surveyor does. Either way, the description should be checked against the current boundary. Ask the utility early who is responsible.
Can I negotiate the location of a utility easement?
Often you can, especially before the line is designed or installed. Utilities may adjust alignment or width when there’s a good reason and an alternative works for them. A surveyor’s overlay showing conflicts with your plans helps that conversation. Your attorney can advise on the agreement terms.
What happens if a recorded easement has an error?
Fixing it usually requires a corrective or replacement document signed by the same parties. That can take time and may involve the utility’s legal team. Errors can also complicate future title work and permits. Catching mistakes before recording is much easier.